Application List

Service/
Site Name
Building
Application
Thermal
Application
Thermal
Utiliza.
Grid-
Indep.
Est.
Savings
ARMY
Fort Bliss Laundry Process Hot Water 90% -- $59,000
Fort Eustis Swimming Pool Pool Water/DHW 55% YES $35,000
Fort Huachuca Barracks Space Heat/DHW 44% --- $67,000
Fort Richardson Armory Building Space Heat/DHW 45% YES $67,000
U.S. Army Soldier Systems Center Central Heating Plant Make-up/Condensate 45% --- $53,000
Picatinny Arsenal Central Heating Plant Boiler Make-up Water 100% --- $94,000
Pine Bluff Arsenal Central Heating Plant Boiler Make-up Water 90% YES $63,000
US Military Academy Central Heating Plant Boiler Make-up Water 70% --- $30,000
Watervliet Arsenal Central Heating Plant Boiler Make-up Water 58% YES $76,000
AIRFORCE
911th Airlift Wing Central Heating Plant Space Heat 29% -- $44,000
934th Airlift Wing Central Heating Plant Make-up/Condensate 39% -- $25,000
Barksdale AFB Hospital Space Heat/Reheat 90% -- $40,000
Davis-Monthan AFB Gymnasium DHW/Absorp Chiller 65% -- $61,000
Edwards AFB Hospital DHW/Space Heat 23% -- $96,000
Kirtland AFB Central Heating Plant Boiler Make-up Water 56% -- $58,000
Laughlin AFB Hospital Space/Reheat/DHW 75% -- $41,000
Little Rock AFB Hospital Space Heat/Reheat 86% -- $91,000
Nellis AFB Dorm/Central Heating Plant DHW/Showers 40% -- $38,000
Vandenberg AFB - - - -- -
Westover ARB Central Heating Plant Make-up/Condensate 49% -- $54,000
NAVY/MARINES
CBC Port Hueneme Swimming Pool Pool 92% -- $73,000
Naval Hospital
MCB Camp Pendleton
Hospital DHW 75% -- $97,000
NAS Fallon Galley DHW 9% YES $58,000
Naval Hospital
NAS Jacksonville
Hospital Space /Reheat/DHW 56% -- $90,000
Naval Station Newport Central Heating Plant Boiler Make-up Water 90% -- $103,000
Naval Oceanographic Office Office Building Space Heat/Reheat 12% YES $39,000
Subase New London Central Heating Plant Boiler Make-up Water 90% --- $98,000
Naval Hospital
MCAGCC Twentynine Palms
Hospital DHW 60% YES $57,000
US Naval Academy Academy Dormitory Kitchen DHW 70% --- $38,000
OTHER:
National Defense Center
for Environmental
Excellence (NDCEE)
Office/Research Chemical Evaporator 19% -- $16,000


Notes:
Service/Site Name - DoD service branch and fuel cell site.
Building Application - Building type interfaced with fuel cell.
Thermal Application - Building thermal load interfaced with the fuel cell.
Thermal Utilization Percentage - Percentage of available fuel cell thermal output utilized by site as
originally estimated in the Site Evaluation Report.
Grid Independent - Whether the fuel cell is configured to provide electrical back-up to utility grid outages.
Estimated Savings - Estimated annual fuel cell energy savings based on electric and natural gas/fuel oil
(from displaced thermal load) savings and input natural gas cost for operating the fuel cell. Maintenance
costs (included in DoD Program) are not included in savings estimate.